All carrier SLAs

Express · Netherlands, Europe, International

UPS claim deadlines, liability and evidence

UPS requires notice within 14 days of receipt for damage, 21 days for delay, and 60 days from hand-over for loss. All claims are time-barred unless written notice is given and proceedings brought within 8 months.

Tightest deadline

14 days

Standard cap

Regime cap unless declared value bought

Liability regime

Mixed

UPS publishes a three-tier notice structure that catches people out, because the three deadlines are very different lengths and are counted from different events. On top of that sits an 8-month long-stop: even a properly notified claim dies if it is not pursued within that period.

Claim windows

UPS applies AVC 2002 to carriage within the Netherlands other than by air, and the CMR Convention to international road carriage.

Damage, including partial loss

14 days

Counted from receipt.

Delay

21 days

Counted from the date the goods were placed at the disposal of the person entitled to take delivery.

Loss

60 days

Counted from the date the goods were consigned to UPS for carriage.

Long-stop: written notice and legal proceedings

8 months

Counted from delivery, or from the scheduled delivery date where the goods were never delivered.

All claims against UPS are barred by expiry of time after this period.

Insured versus uninsured

No additional cover

Governed by the applicable regime: AVC 2002 at EUR 3.40 per kilogram for non-air carriage within the Netherlands, and CMR at 8.33 SDR per kilogram for international road carriage.

With cover bought

UPS offers declared value / additional protection against loss or damage for an additional charge, which raises the ceiling above the regime cap.

Delay and late delivery

Where UPS offers a service guarantee, a guarantee refund is a separate commercial remedy from liability. Under CMR and AVC, delay damage is capped at the carriage charge.

Evidence required

  • Tracking number
  • Commercial invoice evidencing the value of the goods
  • Photographs of the damage and the packaging
  • Written notice within the applicable window

Exclusions

  • Consequential loss
  • Goods on the UPS prohibited articles list
  • Claims outside the 8-month long-stop, regardless of merit

Filing the claim

Who files
The shipper of record, or the party UPS contracted with.
How to file
Through the UPS claims portal for the Netherlands, or in writing to UPS.
Processing time
Not published as a fixed service level.

What quietly kills UPS claims

1

Three different clocks: 14 days for damage, 21 for delay, 60 for loss. Each also runs from a different event, and the loss clock runs from hand-over rather than from the expected delivery date, which makes it shorter in practice than it looks.

2

The 8-month long-stop requires proceedings to be brought, not merely a claim to be filed. A claim sitting open in the portal does not preserve the position.

3

Within the Netherlands, non-air carriage falls under AVC, so the EUR 3.40 per kilo cap applies to domestic UPS road movements too.

4

Declared value is a per-shipment purchase made at booking. There is no retroactive route to it.

FAQ

How long do I have to file a UPS claim?

It depends on what went wrong: 14 days from receipt for damage including partial loss, 21 days for delay, and 60 days from the date the goods were consigned to UPS for loss. Separately, all claims are time-barred unless written notice is given and proceedings brought within 8 months.

What is the UPS 8-month rule?

All claims against UPS in connection with a shipment are barred by expiry of time unless legal proceedings are brought and written notice given within 8 months of delivery, or of the scheduled delivery date where the goods were never delivered.

Which liability regime applies to UPS in the Netherlands?

For carriage within the Netherlands other than by air, the Algemene Vervoercondities 2002 apply, capping liability at EUR 3.40 per kilogram. International road carriage falls under the CMR Convention at 8.33 SDR per kilogram.

Sources

Verified 28 July 2026. This page summarises publicly published conditions for reference. A negotiated carrier contract, a rate-card annex or a service-specific annex can override any of it. Always check the deadline in your own agreement before relying on a figure here. Spotted a figure that has changed? Tell us and we will correct it.

Compare with other carriers

Never miss a UPS deadline again.

Dispatchly watches every parcel against UPS's windows, flags the ones about to expire, and files with the evidence they actually ask for. Flat monthly fee, and you keep 100% of what you recover.